Delivering excellence across diverse sectors with a commitment to quality and innovation.
The project consisted of the construction of a new single-storey Crematorium Building, and associated works.
New reception building with associated external works including large car park, landscaping, drainage and roads.
The fire damaged structure was demolished and removed from site. The project comprised of new foundations and structural steel portal frame, wall cladding and roof.
new build Crematorium together with a chapel, along with an associated memorial garden, new access roads and public car parking facilities.
Construction of a new shared used community building in Penarth including construction of a new pavilion, adjustment to external works areas and construction of footpaths, retaining walls and landscaping and creation of external level pedestrian access.
Addition of two additional training rooms with IT provisions and an interview room facility by constructing an extension located on a strip of land between the existing bowling green and the west elevation of the existing St Mellons Library and Hub.
A transformative expansion project, creating a safe, inclusive and supportive environment for an additional 40 students.
A new structural steel frame fixed through the existing flat roof and cladded with composite insulated panels.
As part of Welsh Government’s 21st Century Schools Programme, The project was for a stand-alone building with link canopy to the existing school, providing a new block of classrooms, main hall, kitchen and bathroom facilities.
The works consisted of a double extension and refurbishment of the existing school buildings plus associated external works to the playground, car parks and grass and recreational areas.
Brand new 26,203 sq ft industrial sustainable warehouse offering open plan warehousing and manufacturing space, office accommodation and 4 level access doors.
2,000m2 builders merchant unit, which includes offices, canteen, product showroom, second floor mezzanine and warehouse, associated car parking, access road and S278 works, external works, services and infrastructure.
The development of 3 new buildings of 15 high quality light industrial units, along with the associated site infrastructure and landscaping.
Two large storage buildings built in the 1970s, removal of all asbestos material, renew roof purlins and side rails and to re-clad both buildings with a single skin box profile sheet.
New bus terminus with 4 bays, a covered station building, space for a kiosk and various environmental enhancements including a green roof, rain garden, outdoor seating areas, and associated highway work.
A fully integrated bus and rail interchange, alongside a range of additional features, designed to provide seamless travel across bus and rail in the heart of Porth’s town centre. With a curved concourse ceiling and soffits on the station’s exterior.
Improving the existing facilities at Pont Ar Daf, creating a fit-for-purpose car park from which visitors can access the iconic Brecon Beacons. With the addition of new visitor facilities.
Works consisted of the construction of new access roads, together with associated drainage and site services installations, working closely with the ecologists for the protection of badgers and water voles.
The scheme comprised 41 independent living apartments alongside the re-provision of an existing community centre, with an associated garden and Multi-Use Games Area.
The scheme consisted of 18 homes for affordable rent, utilising MMC timber frame, Structural Insulated Panels (SIPs) approach.
The 16 new homes were constructed using off-site manufactured timber frames, erected on site with a face brick envelope.
21 affordable and sustainable homes, set within a well established existing residential area and opposite a community hub.
Construction of a new retail park for Lidl, Home Bargains and Greggs alongside the construction of the foundations for McDonalds modular unit. BREEAM Very Good.
The design and construction of Costa Coffee retail unit comprised of the building shell, all incoming services and bin store together with external works.
The construction of poroton block walls with concrete columns, steel roof structure with Alucobond roof and wall cladding, external render, aluminium curtain walling and full M&E installations.
2,000m2 builders merchant unit, which includes offices, canteen, product showroom, second floor mezzanine and warehouse, associated car parking, access road and S278 works, external works, services and infrastructure.
Semi-independent living project constructed to house individuals with complex health needs and a range of physical disabilities.
The scheme added another 49 units as well as a therapy building, 4 buildings to accommodate nursing, redevelopment of an existing two storey 19th Century building.
The Recycling Centre is one of the largest household recycling centres in the region, and the Reuse shop will be home to Bristol Waste’s largest Reuse Shop and workshop.
Construction of a new waste processing plant building, structural steel frame and cladding on piled RC foundations, and associated external infrastructure works.
In partnership with CCHA and currently under construction, the site will see 58 homes and apartments built to EPC A.
The restoration will provide 30 affordable homes and new commercial units, in partnership with Beacon Cymru Group.
The Cardiff Bay Calisthenics Park will be Cardiff’s largest outdoor exercise facility. In partnership with Cardiff Council.
In partnership with Hafod Housing Association, the site will feature 30 apartments and 4 houses.
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
| Cookie | Duration | Description |
|---|---|---|
| viewed_cookie_policy | 1 year | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |